1
/
of
8
VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018
VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018
1Order onlineChoose your options
2Processing1–2 business days
3Estimated transit3–5 business days
Shipping details · Standard shipping: $8.00
Eligible returns: 30 days after delivery
Regular price
$32.00 USD
Regular price
$61.99 USD
Sale price
$32.00 USD
Shipping calculated at checkout.
52 in stock
Quantity
Couldn't load pickup availability
SKU:1922383012518394
VEVOR telescoping aluminum work plank with an adjustable 8-13 ft length range and 500 lbs maximum capacity. The plank has a 12.5 in width, built-in locks, a non-slip wide-tread platform, and straps at both ends for fastening to a scaffold footboard.
It is designed for indoor and outdoor scaffold work, including painting, hanging drywall, repair work, installing lights, and cleaning windows and doors.
- Model: WBS-018
- Material: Aluminum Alloy
- Adjustable Length: 8-13 ft
- Max. Capacity: 500 lbs
- Item Width: 12.5 in
- Net Weight: 34.39 lb
- Product Dimensions (Closed State): 90.55x12.8x3.34 in
- Includes: Telescoping Plank, Stainless Steel Wing Screws, Stainless Steel Hexagonal Screw, Stainless Steel Nuts, User Manual
Shipping
Shipping
Review the store shipping policy for available delivery options and timing.
Returns & refunds
Returns & refunds
Review the store refund policy for eligibility and instructions.
